Germany

Last Tunnel Breakthrough
in Thuringia

The 1,490 m long 2-track Fleckenberg Tunnel between the Silberberg (7,391 m) and Massenberg (1,051 m) tunnels is part of the 107 km long new Ebensfeld-Leipzig rail route with altogether 22 tunnels totalling 41 km accounting for 38 % of the route. It is due to open in 2017. It belongs to the 500 km long new/upgraded Nuremberg-Erfurt/Halle rail route, German Unity Transport Project (VDE) No. 8.

The Fleckenberg Tunnel was embarked on in June 2011 and driven in part-excavations (crown, bench and floor).The breakthrough ceremony took place on March 6, 2012. A total of around 400,000 m³ of rock...

Related articles:

Issue 04/2015 Germany

New Wendlingen–Ulm Rail Route: Imberg Tunnel Breakthrough

The DB Projekt Stuttgart-Ulm GmbH broke through the almost 220 m long mined section of the Imberg Tunnel on the new Wendlingen–Ulm rail route on June 30, 2015 following a three-month construction...

more
Issue 04/2014 Sweden

Hallandsås Rail Tunnel Extreme Excavating Conditions

The Malmö-Göteborg rail line, one of the country’s arteries for passenger and goods traffic, has been upgraded as a high-speed route, which will reduce travelling time between the two centres by...

more
Issue 05/2013 Switzerland

Roveredo Bypass: Tunnel Breakthrough

A 2-lane bi-directional tunnel is being built for the Roveredo Bypass – with shoulders at both sides and 2 lay-bys. It has up to 3,000 m overburden and runs north with 0.8 % gradient lying in an arc...

more
Issue 07/2011 Germany

Breakthrough at Bleßberg Tunnel

The 8,314 m twin-track long Bleßberg Tunnel is the longest on the new Ebensfeld-Erfurt rail route – German Unity Rail Project No. 8 (VDE 8.1) and once commissioned will be the third longest...

more
Issue 01/2015 Germany

Steinbühl Tunnel: More than 50 % excavated

The 4847 m long Steinbühl Tunnel and the 8806 m long Boßler Tunnel, both with single-track bores, are part of the 14.5 km long Albaufstieg 2.2 planning approval section, which is an element of the...

more