Motorway A4 Haudiomont/F

Efficient Renovations of Motorway Culverts using Special Formwork

The French motorway A4 connects the capital Paris with the economic region around Strasbourg, which is one of the most productive in the country. That makes this motorway one of the most important and frequently travelled roads in France.

Basic Conditions

In the forests of Haudiomont Département Meuse, Lorraine), not far from Verdun, for many kilometres the A4 runs along the top of an embankment. Along the way many tube shaped openings for wild animals and pedestrians go through it on the ground level. Here the ground is horizontal. The concrete shell in three of these culverts had begun to...

Related articles:

Issue 05/2018 Austria/Slovenia

Karawanken Tunnel: ASFINAG starts Construction of the second Tube

On September 18, 2018, ASFINAG (Austrian Motorway Authority) heralded in the complete further development of the Karawanken Tunnel with the ground-breaking ceremony on the A 11 Karawanken motorway....

more
Issue 03/2022

Special Formwork for Feuerbach Tunnel

For the supply of all special formwork (such as formwork for the widening, connecting structures, cross-passages and the access of the Prague intermediate access), the JV Tunnel Feuerbach (Baresel...

more
Denmark

Fehmarnbelt Tunnel: 10 000 Tons of Special Formwork Delivered

After its planned completion in 2029, the Fehmarnbelt Tunnel will connect Denmark and Germany for road and rail traffic. The immersed tunnel with a total width of 45 m consists of concrete elements...

more

Custom Timber Formwork for the Feuerbach Tunnel

However, the three companies Baresel Tunnelbau GmbH, Kunz Untertagebau GmbH and Bertschinger Bau GmbH, organised in a consortium, completed the Feuerbach Tunnel in spring 2022. All customised...

more
Issue 07/2017

Stuttgart–Ulm Rail Project: The Tunnel below the A8 Motorway on the Swabian Alb

The Tunnel beneath the BAB A8 The 377?m long, twin-track tunnel underpasses the motorway at a glancing intersection at the western end of the PFA 2.3 (Fig. 2). It was built in 10?m long blocks by...

more