RAMS Technology for Railway Engineering in the Gotthard and Ceneri Base Tunnels

The base tunnels on the new rail links passing through the Alps (NRLA) are planned to last for more than one hundred years. High requirements were posed regarding permissible risks and fault frequency so that the railway engineering equipment functions as safely and reliably as possible. The fulfilment of these requirements must be documented by the contractor by means of secured predictions. RAMS technology forms the basis for this in keeping with CENELEC Standard 50126, which has been applied in its entirety for the first time for infrastructure projects of this magnitude.

1 Background

Thanks to the new rail routes crossing the Alps a fast and efficient rail link is being created for transport traffic in a north-south direction. The NRLA Gotthard axis in addition to the new Gotthard-South rail route primarily constitutes the Gotthard Base Tunnel (GBT) and the Ceneri Base Tunnel (CBT) (Fig. 1). The 57 km long GBT was ceremoniously opened on June 1, 2016; the 15 km long CBT is currently being built as the southern access and will start operating in 2020.

The AlpTransit Gotthard AG (ATG), a fully-owned subsidy of the Swiss Federal Railways (SBB) as the principal for...

Find out more in the current Issue. Order now.

Related articles:

Last sleeper laid in the Gotthard Base Tunnel

Switzerland. On October 31, 2014 the last rails were laid in the Gotthard Base Tunnel. At a distance of around 54 m from the south portal, the contractor cast the “golden sleeper”. A big moment for...

more
02/2012 New Brochure

AlpTransit Gotthard

New Transport Routes through the Heart of Switzerland 12/2011: 48 pp. (DIN A4) with 90 Ills. + Tables. Available from: AlpTransit Gotthard AG, Lucerne – www.alptransit.ch Since driving operations...

more
06/2010 Switzerland

GBT: Installation of the Rail Technology

The installation of the rail technology in the western bore has begun at the south portal of the Gotthard Base Tunnel – between Bodio and Faido. The roughly 16 km long part-section will be completely...

more
06/2017 Switzerland

Ceneri Base Tunnel – Installation of Railway Equipment has begun

At the north portal of the Ceneri Base Tunnel, installation of railway equipment in the east bore started in summer 2017. The 15.4 km long base tunnel between Camorino and Vezia will be equipped in...

more
07/2010 Switzerland

Gotthard Base Tunnel: TBM restarts in Faido west tunnel

On 4 March 2010 excavation had to be stopped in the west tunnel of the Gotthard Base Tunnel some 9 km from the Faido multifunction station due to a rock inrush, and exploratory bores had to be...

more