Sika Deutschland

Bonded Tape Sealing Solution for Plastic Membrane Transitions

The waterproofing of road or rail tunnels generally consists of waterproof concrete and/or concrete construction with a plastic waterproofing membrane. A change of the type of waterproofing within a structure is often necessary, for example at the junction of cross passages with membrane waterproofing to segment lining tubes. Technical and operating rooms are often housed in such cross passages, which is why the German rail tunnel guidelines of DB requires the waterproofing class “completely dry” for cross passages according to DB guideline 853, Modul 4101 “Waterproofing and drainage”....

Related articles:

Issue 2012-07 Antwerp/Belgium

Brine Freezing for Cross-Passages in the Liefkenshoek Tunnel

The Liefkenshoek rail tunnel is being constructed in Antwerp. Ground freezing for 15 cross-passages represents part of the scheme. The altogether 16.5 km long rail tunnel will form a new north-south...

more
Issue 2012-03

Lungern Bypass: Sprayed Concrete Application directly onto Polymer Waterproofing Membranes

1 Overview In the tunnel widenings for the Lungern bypass/CH, sprayed concrete was applied directly onto the flexible polymer waterproofing-membrane (PWM) in the arch area instead of inner lining...

more
Issue 2019-03 Sika Deutschland

Full-Area Grouting behind existing Shotcrete Layer

After more than 60 years of use, refurbishment of the road tunnel between Neuhaus and Spitzingsee bei Schliersee, Germany, was urgently necessary. The waterproofing directly behind the shotcrete inner...

more
Issue 2015-02 Switzerland

Tunnel de Court broken through

The Tunnel de Court is the last tunnel in the Swiss infrastructure project „A16 Transjurane“, which includes the building of 85 km of the autobahn A16 between Biel and Boncourt on the French border...

more
Issue 2014-06 Switzerland

Self-Rescue in the Simplon Tunnel

The 19.8 km long Simplon Tunnel (completed in 1922) between Bries (Switzerland) and Iselle (Italy) possesses two single-track bores with two sets of points at the centre of the tunnel and...