Formwork Concepts for in-situ Concrete Cut-and-Cover Tunnels

Increasing urbanisation will lead to more than five billion people living in large cities by 2030 [1]. In addition to digital networking, it is necessary to provide mobility for these fast-growing metropolitan areas with rapid transportation routes. EU programmes for the development of the European Single Market like TEN-T include plans for the building of 58 000 km of long-distance roads, 70 000 km of railway lines and 12 000 km of national roads by 2020. As a result of this, tunnelling will play an even more significant role in the future.

In Germany, tunnel projects with a relatively constant cumulated length of about 170 km per year are to be expected. From the formwork manufacturers’ point of view these projects will be of great interest. At the turn of the year 2015/16, only 13.6 % of tunnel projects were cut-and-cover (Fig. 1), compared to mechanically bored (42.3 %) and the shotcrete method (44.0 %) [2]. The overall European potential is however considerably higher due to the construction of e.g. new underground and rapid transit lines in Paris and London, road tunnels in Norway and submerged tunnels in the Baltic.

Cost-Eff...

Related articles:

Issue 02/2009 Formwork Technology

Speedy Formwork for the Gibelin Tunnel near Solothurn/CH

Formwork exactly geared to the construction scheme cuts down on the construction time and minimises costs. This was no different at the Solothurn site, Bypass West in Switzerland during the production...

more
Issue 02/2016 Germany

Flexible Formwork System for the Branich Tunnel

In summer 2016, the 1796 m long single-bore Branich Tunnel is due to open as part of the bypass for the small German town of Schriesheim, north of Heidelberg on the Bergstraße. About 1600 m are...

more
USA

State Route 99 Tunnel: Formwork Solution for Double-Deck Tunnel

A Replacement for the Alaskan Way Viaduct After the Alaskan Way Viaduct had suffered considerable damage due to a major earthquake in 2001, initial preparations were made for a replacement. Eight...

more
Issue 04/2017

State Route 99 Tunnel: Formwork Solution for Double-Deck Tunnel

A Replacement for the Alaskan Way Viaduct After the Alaskan Way Viaduct had suffered considerable damage due to a major earthquake in 2001, initial preparations were made for a replacement. Eight...

more
Issue 04/2019

Potentials for Optimisation of In-Situ Concrete Tunnel Construction

On these criteria – optimisation of both productivity and process costs – formwork specialist Peri unveiled at the 2019 bauma construction-machinery fair in Munich (Germany) a number of remarkable...

more