Red Line Tel Aviv: Planning and Constructing the TBM Tunnels of the Eastern Section (Part 2)

The Red Line is the first line of the Tel Aviv urban railway. 2 x 2.7 km tunnels were driven using two EPB tunnel boring machines from Herrenknecht for the eastern section of the Red Line. It is being built by a consortium comprising the Israeli construction company Danya Cebus and the Chinese contractor CCECC. The WBI GmbH undertook the detailed design and accompanied construction activities on behalf of the joint venture. This report follows up on the previous one that was published in tunnel 4/2019. It deals with the appropriate mix composition of the annular gap grout and the driving activities in the tunnel sections in clay and Kurkar.

6 Annular Gap Grout

A cement-based mortar was used for grouting the annular gap for tunnelling the eastern section of the Tel Aviv Red Line [2]. The mixes applied are presented in Table 1. The grout properties were tested in the lab at the WBI-Center.

The fresh mortar has a density of 2.1 g/cm³. Workability was proven by means of slump tests, in which horizontal slumps of roughly 50 to 60 cm could be achieved on up to 6 h old samples.

The deformability of the annular gap mortar in its fresh state is of decisive importance for dimensioning the segmental lining. Therefore, oedometer tests were...

Related articles:

Issue 2016-07 Research and Development

New Test Stand for annular Gap Mortars

A qualitatively high-grade tunnel lining requires the tunnel segment annular gaps to be properly grouted. At the same time, this provides a decisive contribution to a high rate of advance during...

more
Issue 2009-05 Construction Equipment

Mixing and Grouting Systems for the Weinberg Tunnel in Zurich/CH

Mixing and grouting systems made by Häny are being used to construct the new Alstetten – Zurich Main Station - Oerlikon cross-city underground link in Switzerland. In contract section 3 (Weinberg...

more
Issue 2019-04 MC-Bauchemie/Porr Bau GmbH

New Cementless TBM Backfill Grout

In mechanised tunneling, concrete segments can be positioned to create the inner lining of the tunnel. The action of the tunnel boring machine is toleranced to create a clearance between the...

more
Austrian Tunnel Day 2018

STUVA Research awarded Innovation Prize

Water-permeable Annular Gap Material for Single-Shell Drained Segment Linings

On 10 October 2018, the Austrian national committee of the International Tunnelling and Underground Space Association (ITA) awarded their innovation prize to the STUVA for the “development of a...

more
Issue 2018-03

Strength Development of Two-Component Grouts for Annular Gap Grouting

1 Introduction and Motivation In mechanized tunnelling with segmental lining a cavity emerges during the production of the tunnel between the surrounding soil and the exterior wall of the tunnel with...

more