Switzerland

Tunnelling the Gotthard – Success Story GBT

For centuries, the Gotthard Massif has been an almost insurmountable barrier in the Alps – but since 11 December 2016, the official opening of the base tunnel for services by the SBB, it will now only take 20 minutes for a train to pass through the mountain. The Gott-
hard Base Tunnel (GBT), which was ceremonially opened on 1 June 2016 in the presence of leading European politicians, is now open for rail travellers after more than 20 years of design and construction. As part of the NRLA transit concept and the European goods traffic corridor A (Rotterdam–Genoa), the base tunnel is a construction work of the century for Europe.

The design and construction history of the GBT has set standards for modern tunnel building. Tunnelling projects all over the world will profit from the innovations in tunnelling technology, concrete and waterproofing systems and materials management. In order to ensure this knowledge and practical experience for posterity, the Swiss Tunnelling Society (STS) has now published the reference book “Tunnelling the Gotthard”, a documentation of the project that is unique in this form. More than 100 people involved in the project describe specific specialist perspectives and analyses. Divided into 18 themed sections, the articles deal with subjects including the political environment in the 1980s, high-level management processes, the design and management of the project, tendering and construction – with all points of view including logistics and surveying, materials management, M&E installation and railway equipment to environmental questions.

After the publication of the German edition for the opening ceremonies in June 2016, the English edition of this major project documentation is now available in time for the official start of services in the GBT.

View sample pages under:

www.tunnel-online.info/success-story

Tunnelling the Gotthard

Published by the STS Swiss Tunnelling Society

720 pages, hardback, marker ribbon, end pocket with supplements (schematic general layout, effective construction programme, geological findings along the east tunnel)

2935 g

ISBN 978-3-033-05485-1 (German)

ISBN 978-3-033-05803-3 (English)

Buy the Book at:

Profil – Buchhandlung im Bauverlag

Telephone: + 49 5241/80-88957

Email: profil@bauverlag.de:profil@bauverlag.de%3C/a%3E" >

www.profil-buchhandlung.de

x

Related articles:

Issue 2016-04 Switzerland

Tunnelling the Gotthard: Tunnellers present comprehensive Engineering Book about the Gotthard Base Tunnel

In the middle of May, a few weeks before the official ceremony to open the Gotthard Base Tunnel (GBT), the Swiss Tunnelling Society (Fachgruppe für Untertagbau/FGU) presented their comprehensive...

more
Issue 2011-08 Switzerland

Gotthard Base Tunnel: Industrial Safety

The 57 km long Gotthard Base Tunnel with its 2 single-track bores and 2 Multi-Function Stations 1/3rd and 2/3rds of the way along the tunnel with emergency stops and crossovers given up to 2,500 m...

more
Issue 2011-02 Switzerland

Gotthard Base Tunnel wins International Tunnelling Award

Representing the Swiss Underground Community, the Swiss Tunnelling Society picked up the NCE International Tunnelling Award for the Project Gotthard Basetunnel in December 2010, at the Grosvenor House...

more
Issue 2015-01 Switzerland

Gotthard Base Tunnel: Track Installation completed

At the end of October 2014 the final sections of track were laid in the Gotthard Base Tunnel (GBT). This means that the world’s longest rail tunnel can now be negotiated over its entire 57 km length...

more
Issue 2016-05 Switzerland

Swiss Tunnel Congress 2016

The Swiss Tunnelling Society (STS/FGU) as part of the Swiss Engineers and Architects Association (SIA) staged the 15th Swiss Tunnel Congress at the Lucerne Culture and Congress Centre from June 15 to...

more