Liechtenstein

Ludwig Elkuch AG Pools Its Strengths in Elkuch Doorsystems

Since January 2020, Ludwig Elkuch AG has merged its two company branches Elkuch Bator and Elkuch Eisenring in the field of tunnel doors for roads and railways internationally and relocated them to the parent company in Bendern in Liechtenstein.
After one year, the advantages of this move have become clear: In addition to a central contact point for all areas of the international tunnel business, be it consulting, sales, planning as well as assembly and service, the entire construction and new development also takes place in Bendern.
With an innovative design and planning department headed by Nicolas Elkuch, Elkuch Doorsystems is well on the way to implementing ideas and concepts quickly and efficiently. In this way, projects such as new fire protection, innovative drives but also entire door concepts could be realised. By merging the divisions, Elkuch Doorsystems has also created a central contact point for business offers, enquiries and technical enquiries.
www.elkuch.com
x

Related articles:

Issue 01/2021 Liechtenstein

Ludwig Elkuch AG Pools Its Strengths in Elkuch Doorsystems

Since January 2020, Ludwig Elkuch AG has merged its two company branches Elkuch Bator and Elkuch Eisenring in the field of tunnel doors for roads and railways internationally and relocated them to the...

more
advertorial/advertisement

Innovative services in the tunnel door and gate sector

Tunnel 4.0 Also the tunnel sector is not exempted from BIM and digitalisation. Efficient logistics as well as regulated maintenance are the goal. In close cooperation with Siemens, Elkuch is...

more
Issue 06/2022 Denmark

Replacement of Emergency Doors in the Great Belt Tunnel

The Swiss Elkuch Group has been awarded with the replacement of emergency doors in the Great Belt Tunnel (Storebælttunnelen) in Denmark by Sund & Bælt Holding A/S. The two tubes of the Great Belt...

more
Issue 03/2021 Elkuch Door Systems

Pressure-Neutral Swing-Sliding Door for Tunnel Cross-Passages

Railway tunnels pose a special challenge for door systems: dynamic alternating pressure loads of up to 10 kPa at several million load changes and static pressures of up to 30 kPA are requirements that...

more
Issue 01/2018 SCAUT/Elkuch Group

Plug-in Crosscut Element – Installation in less than 90 Minutes

On 14 December 2017, the SCAUT consortium under the leadership of the Elkuch Group introduced the project “Crosscut Closure Module” to an expanded SCAUT audience in the Hagerbach Test Gallery (VSH)....

more