ÖVBB “Shotcrete” Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5.

Fax 0043.1.504.9599.

The present guideline on “Shotcrete” represents the third revised edition of the Guideline on Concrete, Part 1 – Application (1989) and Part 2 – Testing (1992) published by the Austrian Concrete Association (ÖBV) and applied extensively throughout Europe. Thanks to the harmonising of the corresponding norms for shotcrete (EN 14487 series) national norms were withdrawn and an adjustment to this guideline...

Related articles:

Issue 2010-03

ÖVBB "Shotcrete" Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5. Fax...

more
Issue 2013-06 Book Review

Austrian Guideline on Tunnel Seals

Austrian Society for Construction Technology (öbv) Guideline, December 2012. 124 pp. DIN A4 with 96 Ill./Tab. and 106 Sources. Bound € 45. //www.bautechnik.pro:www.bautechnik.pro:www.bautechnik.pro...

more
Issue 2012-07 Code of Practice on Sintering Potential

Establishing reduced Sintering Potential for Tunnel Drainage

In the case of tunnels produced by mining means liquids from the carriageway are usually removed separated from accompanying underground water. Sintering of the secondary drainage system for transport...

more
Issue 2010-05

Tunnel Drainage

Guideline Issued by: Österreicherische Vereinigung für Beton und Bautechnik (ÖVBB) 4/2010: 99 pp. A4 with 108 Ills./Tables and 180 Sources. ÖVBB, A-1044 Vienna, Karlsgasse 5, Fax:...

more
Issue 2015-03

Influence of the reac­tive Components on Shotcrete Performance

1    Introduction The shotcrete method has become established in European tunnelling since the 1960s, and is carried out in the following steps: first, the rock is excavated, for example by...

more