New STUVA Offices in Cologne finished

Following an 18-month period of construction, the time had come in March 2019 for the entire STUVA and STUVAtec GmbH team to pack their moving boxes and switch to the recently completed new building. The move could be accomplished on foot as the modern building is located directly alongside the old headquarters on the established company premises. Once the move was finished, the STUVA set about the extensive task of refurbishing the rather outdated existing building and plans to lease it to a suitable tenant as from autumn 2019.

Since 1977, the old offices located on the Mathias-Brüggen-Straße...

Related articles:

Issue 04/2020

60 Years For Transport – STUVA Anniversary

It all began on the 5th January 1959. On this day in the Rotary-Club in Mühlheim an der Ruhr, Karl Schmitz-Scholl, founder of the Tengelmann Group, presented his vision of an underground railway...

more
Issue 04/2017 STUVAtec

Daniel Hahne: certified Expert and Specialist Designer for preventive constructional Fire Protection

For many years, the STUVAtec GmbH has been certified by the TÜV Nord as a producer of fire protection plans for the Deutsche Bahn AG and has developed fire protection plans for numerous major...

more
Issue 07/2010 STUVA news

STUVA news

Professor Alfred Haack turns 70 In October 2010, Professor Alfred Haack celebrated his 70th birthday. His name is inseparably linked with STUVA, the Research Association for Underground Transportation...

more
Issue 03/2012 Research and Development

STUVA News

On January 19, 2012, the joint ESIMAS project was inaugurated at the Federal Highways Research Institute (BASt). ESIMAS (Echtzeit-Sicherheits-Management-System) stands for Real Time Safety Management...

more
Issue 03/2010 New Products

Cable Protection Pipes as ready-made empty Duct Pack

Together with the Heibel GmbH trade agency the JV Katzenbergtunnel developed a novel system for laying cable protection pipes as ready-made parts in “pack form”. This saves time and space, the...

more