Tunnelling in Germany:
Statistics 2009/2010, Analysis and Outlook

For more than 30 years, the STUVA has compiled statistics on tunnelling activities in Germany in keeping with a corresponding proposal put forward by the International Tunnelling and Underground Space Association [1].

1 Statistics on Tunnels under Construction 2009/2010

As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2009/2010. The outcome is compiled in tabular form for the month of December 2009 and subsequently assessed. The table follows up its predecessors published for the years 1978 [2] to 2009 [3]. Only tunnels and drain/sewer structures which possess an accessible (walk-in) excavated crosssection, i.e. a clear minimum diameter of 1,000 mm or, including the pipe wall, a minimum cross-section of roughly 1 m2, are listed. On the...

Article as PDF

Related articles:

Issue 08/2011

Tunnelling in Germany: Statistics 2010/2011, Analysis and Outlook

1 Statistics on Tunnels under Construction 2010/2011 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2010/2011. The outcome...

more
Issue 08/2009 Germany

Tunnelling in Germany: Statistics 2008/2009, Analysis and Outlook

1 Statistics on Tunnels under Construction 2008/2009 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn-of-the-year 2008/2009. The outcome is...

more
Issue 08/2012

Tunnelling in Germany: Statistics (2011/2012), Analysis and Outlook

1 Statistics on Tunnels under Construction 2011/2012 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2011/2012. The outcome...

more
Issue 06/2024

Tunnelling in Germany: Statistics (2023/2024), Analysis and Outlook

1 Tunnels Under Construction As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2023/24. The outcome is compiled in tabular...

more
Germany

Tunnelling in Germany: Statistics (2024/2025), Analysis and Outlook

1 Tunnels Under Construction STUVA has been keeping statistics on tunnelling in Germany for more than 45 years. Based on an annual survey of clients, construction companies and designers, the data...

more