Fliegl

ASW Stone Offroad

Companies often find themselves stretched to their limits in foundation engineering, mining and below ground. Whether it’s excessively low halls, bridges or tunnels, construction measures simply cannot be fulfilled using conventional dumpers. Special measures must also be resorted to in the excavation, earth-moving and soil stabilising branch. The Fliegl ASW Stone Off-road truck with its push-off technology offers a solution in such cases. Its stability is outstanding. This is facilitated by a low centre of gravity. Where dumpers tend to lose their equilibrium during unloading, the ASW Stone Off-road still stands safely on its wheels. The Fliegl Bau- und Kommunalktechnik GmbH developed the Fliegl “ASW Stone Off-road” for extremely tough assignments. It is especially suitable for earth-moving as well as transportation within major construction projects. The vehicle first and foremost convinces through its economy: less wear, high time savings and low wage and fuel outlay.   

x

Related articles:

Issue 2015-03 Austria

Second Klaus Tunnel Bore: Start of Excavation in April 2015

Currently the Klaus chain of tunnels between the Klaus and St. Pankraz/Hinterstoder junctions, the Bosruck and the Gleinalm tunnels, which represent undeveloped gaps on the A9 Pyhrn Motorway, are...

more
Issue 2016-05 Austria

Bruck Tunnel Chain redeveloped with an Investment Cost of 220 Million Euros

The tunnels Tanzenberg (2.5 km long), Oberaich (0.2 km), Massenberg (0.4 km), Bruck (1.2 km), St. Ruprecht (0.7 km) and Niklasdorf (1.3 km) belong to the Bruck tunnel chain in Austria. Since 2007,...

more
Issue 2017-07 Germany

VDE 8 completely operational

The 500 km long new/upgraded Nuremberg-Berlin rail route, also known as German Unity Transport Project No. 8 (VDE 8), was approved by the German Parliament in 1991 in the form of a high-speed line (up...

more
Issue 2016-04 Austria

The Klaus chain of tunnels: Klaus Tunnel Breakthrough in March

With the exception of the Klaus chain of tunnels and the Gleinalm Tunnel, Austria‘s Pyhrn Autobahn A9 toward the Slovakian border is fully completed. Work on the Klaus tunnels, specifically on the...

more
Issue 2014-05 Germany

Trade Fair econstra 2014: Tunnel Renovation and Safety

Tunnelling as one of the most complex tasks of civil engineering will be an essential component of the econstra 2014. On October 22 and 23 the fair for construction engineering, architecture and...

more