Jagdberg Tunnel in Thuringia – Injection Structures

The part-section including the approx. 3.1 km long Jagdberg Tunnel takes on a key role during the upgrading of the federal motorway A 4 in Thuringia/D. Injection structures in the Jagdberg Tunnel serve to collect and remove underground water, which might possibly be aggressive to concrete. This report deals with planning, execution and monitoring.

1 Introduction

The A 4 federal motorway is one of the most significant east-west links on the Federal Republic of Germany’s highway network. It connects the centres of Rhine-Main and the Ruhr District with Thuringia and Saxony as well as the developing economic region in east and south-east Europe.

Within the overall project entailing the “redevelopment and new construction of the A 4 motorway”, the part-section between the Magdala and Jena-Göschwitz hubs takes on a key role on account of the shortcomings of the existing route and issues involving scheduling. The approx. 3.1 km long twin-bore...

Related articles:

Issue 2020-03

Sandvik DS512i Rock Bolter

The DS512i is equipped with the new FOPS / ROPS cabin as standard. This reduces noise, vibration and dust levels and improves visibility while drilling and tramming. An interactive graphic user...

more
Issue 2018-03

New Joint Sealing Process for Segment Tunnels

Targeted Sealing of Leaks in Segment Linings In targeted sealing of leaks, the direct route through the joints between segment linings is used in order to drill through the gasket and inject grout on...

more
Issue 2016-08

Forum on Injection Technology 2016

As STUVA CEO Dr.-Ing. Roland Leucker pointed out during the opening ceremony, such a wide response had not been evident during the run-up to the event. As opposed to 70 people taking part in 2014,...

more
Issue 2015-03 Computer aided Drilling

Aiming Tool for executing pre-designed drilling plans

Sandvik Construction Tunneling introduces the add-on instrumentation TCAD+ to their DT and DD series underground drill rigs used in tunneling and mining. The TCAD+ instrumentation, a successor of...

more
Issue 2017-06 Tunnels to Feuerbach and Bad Canstatt for the Stuttgart 21 Project

Injections to restrict ingressing Water in Rock containing Anhydrite

The water-bearing leaching front is sealed by means of drilling in advance of the excavation by grouting polyurethane so that no groundwater can come into contact with the anhydrite-bearing rock. For...

more