Liechtenstein

Ludwig Elkuch AG Pools Its Strengths in Elkuch Doorsystems

Since January 2020, Ludwig Elkuch AG has merged its two company branches Elkuch Bator and Elkuch Eisenring in the field of tunnel doors for roads and railways internationally and relocated them to the parent company in Bendern in Liechtenstein.

After one year, the advantages of this move have become clear: In addition to a central contact point for all areas of the international tunnel business, be it consulting, sales, planning as well as assembly and service, the entire construction and new development also takes place in Bendern.

With an innovative design and planning department headed by...

Related articles:

Liechtenstein

Ludwig Elkuch AG Pools Its Strengths in Elkuch Doorsystems

Since January 2020, Ludwig Elkuch AG has merged its two company branches Elkuch Bator and Elkuch Eisenring in the field of tunnel doors for roads and railways internationally and relocated them to the...

more
advertorial/advertisement

Innovative services in the tunnel door and gate sector

Tunnel 4.0 Also the tunnel sector is not exempted from BIM and digitalisation. Efficient logistics as well as regulated maintenance are the goal. In close cooperation with Siemens, Elkuch is...

more
Issue 05/2025 Hodapp

Unobstructed Escape Route – Pressure Relief Systems for Tunnel Doors

Pressure differences between tunnel areas or technical equipment rooms can make it considerably more difficult to open escape and service doors, especially when the pressure difference is high....

more
Issue 06/2022 Denmark

Replacement of Emergency Doors in the Great Belt Tunnel

The Swiss Elkuch Group has been awarded with the replacement of emergency doors in the Great Belt Tunnel (Storebælttunnelen) in Denmark by Sund & Bælt Holding A/S. The two tubes of the Great Belt...

more
Issue 03/2021 Elkuch Door Systems

Pressure-Neutral Swing-Sliding Door for Tunnel Cross-Passages

Railway tunnels pose a special challenge for door systems: dynamic alternating pressure loads of up to 10 kPa at several million load changes and static pressures of up to 30 kPA are requirements that...

more