Search

Your search for "" found 2029 Hits

Issue 01/2009 Germany

Finne Tunnel: Driving Operations running smoothly

Driving Operations at Finne Tunnel

The tunnel consists of 2 parallel tubes with an external diameter of roughly 11  m, a 45  cm thick segmental lining and connecting passages set every 500  m between the tubes. This results...

more
Issue 01/2009 Construction started on the Jagdberg Tunnel

Construction started on the Jagdberg Tunnel in Thuringia/D

Germany

The Eisenach–Görlitz A 4 federal motorway is highly significant as an important west-east axis in the German and European highway network (European highway E 40). It connects the East German...

more
Issue 08/2008 Formwork Technology

Underwater tunnel Limerick in Ireland

As part of the new M7 motorway development in the southwest of Ireland, the 4-lane route crosses the Shannon near Limerick, a few km before the river flows directly into the Atlantic. Centrepiece of...

more
Issue 08/2008 Formwork Technology

7.4 km long Metro Line M4 for Budapest/H

Opened with line M1 in 1896 when the Hungarian capital celebrated its millennium, the Budapest Metro is the second oldest Underground system in Europe – after the London Underground. Since then, the...

more
Issue 08/2008 Formwork Technology

Complex Formwork for the TGV Tunnel at Cognières/F

Europe is edging closer together along its major traffic arteries under construction. The expansion of the high-speed rail links, co-financed by the EU with a contribution of about 10  %, shows in...

more
Issue 08/2008 Conferences

Drainage Systems in Tunnelling

The group for geotechnics at Graz Technical University (Institute for Applied Geo-Sciences) together with the ETH Zurich (Institute for Construction Planning and Construction Operation), the...

more
Issue 08/2008 Austria

Stress Controller with Resistance Reinforcement

The Tauern Tunnel is part of the Tauern motorway from Salzburg to Villach/A. The first tube of the 6.4  km long tunnel was started in 1971 and completed in 1975 (Figs. 2 and 3). It is numbered...

more
Issue 08/2008 Switzerland

Thun Flood Relief Tunnel, Part 2 – Compressed Air Operations with the Hydro-Shield Method

Need for Compressed Air Work In the case of the hydro-shield method accesses for the recovery of obstacles, which cannot be removed by means of the cutting wheel as well as for checking and replacing...

more
Issue 08/2008 Germany

Tunnelling in Germany: Statistics (2007/08), Analysis and Outlook

1 Statistics on Tunnels under Construction 2007/08 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn-of-the-year 2007/08. The outcome is...

more

Ihre Suche nach "" :

5652 Treffer in "AT Minerals"

8877 Treffer in "Bundesbaublatt"

8295 Treffer in "Betonwerk + Fertigteil-Technik"

7620 Treffer in "bauhandwerk"

1162 Treffer in "Brandschutz"

1185 Treffer in "Computer Spezial"

5304 Treffer in "dach+holzbau"

15105 Treffer in "Deutsche BauZeitschrift"

5681 Treffer in "FACILITY MANAGEMENT"

11068 Treffer in "Kälte Klima Aktuell"

5848 Treffer in "metallbau"

1524 Treffer in "recovery"

11922 Treffer in "SHK Profi"

13282 Treffer in "tab - Das Fachmedium der TGA-Branche"

12156 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2029 Treffer in "tunnel"

5761 Treffer in "Zement Kalk Gips"

3470 Treffer in "Ziegelindustrie International"