Search

Your search for "" found 2132 Hits

Issue 03/2010

ÖVBB "Shotcrete" Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5. Fax...

more
Issue 03/2010 New Products

Cable Protection Pipes as ready-made empty Duct Pack

Together with the Heibel GmbH trade agency the JV Katzenbergtunnel developed a novel system for laying cable protection pipes as ready-made parts in “pack form”. This saves time and space, the...

more
Issue 03/2010

Seminar on Noise and Vibration Protection for Railways

Under the chairmanship of Dr. Friedrich Krüger, STUVA Inc., the Technische Akademie Esslingen will stage a seminar on “Noise and Vibration Protection for Railways”. It will take place from May 5...

more
Issue 03/2010

DBU Research Project – Participation of the STUVA on the Scientific Advisory Board

A standardised procedure to select construction methods for producing underground infrastructure, which are compatible with resources and the environment, is being developed together with the Deutsche...

more
Issue 03/2010

New Research Project “Safer Junctions for more vulnerable Road Users” with STUVA Involvement

Under the guidance of the Bergische Universität Wupper-tal, Institute for Road Traffic Planning and Technology (management) as well as in cooperation with the Leibnitz Institute for Work Research at...

more
Issue 03/2010

UpSafety Project

In October 2009 the “UpSafety” project sponsored by the European Union within the scope of the “Civil Protection Prevention and Preparedness” programme started with participation of the STUVA....

more
Issue 03/2010

Friedrich Krüger turns 65

The head of the group for environmental protection, noise and oscillation technology at the STUVA Inc., Dr.-Ing. Friedrich Krüger (Photo) celebrated his 65th birthday at the end of 2009. Dr....

more
Issue 03/2010 Jagdberg Tunnel on the A4 Motorway

Jagdberg Tunnel on the A4 Motorway Eisenach–Görlitz

1 Introduction The moment had arrived on August 27, 2009. Practically almost 9 months after work officially began on the tunnel on September 26, 2008, the official breakthrough of the first of the 2...

more
Issue 03/2010 Special Steel Structure

Special Steel Structure for the Schwäbisch Gmünd Tunnel

The work was awarded to the JV Tunnel Schwäbisch Gemünd consisting of the companies Ed. Züblin AG, Baresel GmbH, G. Hinteregger & Söhne Baugesellschaft m.b.H. and ÖSTU-STETTIN Hoch- und Tief­bau...

more
Issue 03/2010 Chancelor Line in Berlin

Planning and Building the Chancellor Line in Berlin/D

1 Introduction On August 8, 2009, the new Metro section between the Central Station and the Pariser Platz was opened by the Berliner Verkehrsbetriebe (Fig. 1). This means that the first part-section...

more

Ihre Suche nach "" :

6205 Treffer in "AT Minerals"

9149 Treffer in "Bundesbaublatt"

8858 Treffer in "Betonwerk + Fertigteil-Technik"

8058 Treffer in "bauhandwerk"

1314 Treffer in "Brandschutz"

1393 Treffer in "Computer Spezial"

5773 Treffer in "dach+holzbau"

16005 Treffer in "Deutsche BauZeitschrift"

6057 Treffer in "FACILITY MANAGEMENT"

11917 Treffer in "Kälte Klima Aktuell"

6291 Treffer in "metallbau"

1855 Treffer in "recovery"

12507 Treffer in "SHK Profi"

14024 Treffer in "tab - Das Fachmedium der TGA-Branche"

12521 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2132 Treffer in "tunnel"

5808 Treffer in "Zement Kalk Gips"

3616 Treffer in "Ziegelindustrie International"