Switzerland

Stationary Jaw Crushers for a Landmark Project

Credit/Quelle: GIPO Gisler Power AG | Valentin Luthiger Fotografie

Credit/Quelle: GIPO Gisler Power AG | Valentin Luthiger Fotografie
For the construction of the new Sisikon Tunnel as part of the “Neue Axenstraße” Project, GIPO Gisler Power AG is supplying two GIPO ST B 1490 stationary jaw crushers. During the excavation of the Swiss road tunnel, the two units process the excavated material directly on site and reduce it to a size suitable for conveying. Thanks to high performance, efficient pre-screening, and reliable conveying technology, large quantities of material are processed cost-effectively and reused as a valuable raw material. The Sisikon Tunnel is being constructed by drilling and blasting (full face excavation) over a total length of just under 4.5 km. Completion is scheduled for 2034.

x

Related articles:

Advertorial / Advert

Stationary jaw crushers for a landmark infrastructure Project

With the construction of the Sisikon Tunnel as part of the Axen project, one of Central Switzerland’s most significant infrastructure developments is taking shape along the national road between...

more
Issue 02/2020

Crawler-Mounted Jaw Crushers Process Excavated Material in the Pfons–Brenner Lot of the BBT

Two jaw-crusher machines and a feeder unit, all supplied by Swiss manufacturer GIPO, are in front-line use on the Austrian side of the largest and most southerly construction sector of the new Brenner...

more
Advertorial | bauma 2022

Emil Gisler AG / GIPO AG

Preview bauma Munich 2022 – Your Power for the Future Once more the bauma trade fair in Munich is around the corner. We, Emil Gisler AG/GIPO AG, will exhibit innovative plants and components from...

more
Issue 01/2020

GIPO Jaw Crusher Plants Working at the BBT

Since summer 2019 two track-mounted jaw crushers plants (a GIPOBAC B 1185 PB FDR and a GIPOBAC B 1385 PB FDR) and a feed point on runners from the Swiss company GIPO are being used for material...

more
Switzerland

Implenia and Frutiger Win Contract for Sisikon Tunnel, Key Section of the Neue Axenstraße Project

4.4 km Long Road Tunnel Is Excavated by Drill and Blast The contract centres on the single-tube, 4.4 km two-way road tunnel, which the JV will blast through the rock. The JV is also building various...

more