Adaptive Planning of Grouting Measures in Tunnelling Using Artificial Intelligence

In the course of tunnel drives, pre-support measures can be necessary to waterproof or consolidate the surrounding ground. Since such measures can sometimes drastically slow the advance rate, their efficient planning is of great significance.

One frequently undertaken measure is grouting, which can be carried out flexibly with relatively simple machinery. Alongside this flexibility, continuous adaptation of the parameters as the work proceeds must also be possible. This may mean regular adaptation – both of drilling patterns and depths as well as grouting parameters, grout materials or stop...

Related articles:

Research Project AVANT

Adaptive Planning of Grouting Measures in Tunnelling Using Artificial Intelligence

Real-Time Use of Drilling and Grouting Data for the Construction Process Digital data logging systems have become increasingly prevalent in drilling and grouting technology. These have only been used...

more
Issue 2018-03

New Joint Sealing Process for Segment Tunnels

Targeted Sealing of Leaks in Segment Linings In targeted sealing of leaks, the direct route through the joints between segment linings is used in order to drill through the gasket and inject grout on...

more
Issue 2009-05 Construction Equipment

Mixing and Grouting Systems for the Weinberg Tunnel in Zurich/CH

Mixing and grouting systems made by Häny are being used to construct the new Alstetten – Zurich Main Station - Oerlikon cross-city underground link in Switzerland. In contract section 3 (Weinberg...

more
Issue 2019-03 Sika Deutschland

Full-Area Grouting behind existing Shotcrete Layer

After more than 60 years of use, refurbishment of the road tunnel between Neuhaus and Spitzingsee bei Schliersee, Germany, was urgently necessary. The waterproofing directly behind the shotcrete inner...

more
Issue 2016-07 Research and Development

New Test Stand for annular Gap Mortars

A qualitatively high-grade tunnel lining requires the tunnel segment annular gaps to be properly grouted. At the same time, this provides a decisive contribution to a high rate of advance during...

more