Germany

Construction start for S-Bahn Tunnel Gateway Gardens, Frankfurt

On the approx. 35 hectare site of the former American military housing estate Gateway Gardens in close proximity to Frankfurt Airport, a new city quarter is being developed with office and conference buildings, hotels, gastronomy, specialist shops and local shops. When the new quarter is complete, up to 18 000 people should work there.

The 4 km long “S-Bahn” urban rapid transit link to Gateway Gardens is part of the infrastructure development programme “Frankfurt Rhein Main plus”, which is being implemented by the State of Hesse, the region, the City of Frankfurt am Main, the Rhein-Main...

Related articles:

Issue 2019-03

In mid-March 2019, the member of the Forum for Young Engineering Professionals (STUVA-YEP) convened for the third time. The event was captioned “New Infrastructure under the Challenges of existing...

more
Issue 2018-02 Germany

With the extension of the urban railway line U5 past the main station to the west, Frankfurt’s Europaviertel quarter will gain a high-capacity link to the public transport network of the city. The...

more
Issue 2022-02 Germany

Ground freezing is a flexible procedure that is mainly used for complex measures and for construction works involving existing structures. Here, the ground is solidified and made impermeable to water...

more
Issue 2019-01 November 26–28, 2019 ¤ 26.–28. November 2019

Since 1963, the STUVA has held its tradition-steeped three-day STUVA Conference every two years, featuring all topics and aspects having to do with tunnelling and tunnel operation. The “International...

more
Issue 2020-02 Germany | Deutschland

In September 2019, the German Federal Ministry of Transport and German Railways (DB) commissioned an in-depth feasibility study for a long-distance tunnel beneath Frankfurt am Main Central Station....

more