Romania | Rumänien

Porr to Build Romania’s First Twin Motorway Tunnel

Porr Romania was commissioned by the state road com pany CNAIR to design and build the Sibiu–Pites¸ti motorway, section 4 (Tigveni–Curtea de Arges¸). This 9.86 km long section includes a 1.35 km long tunnel. The total value of the contract is 311 million euros; the construction period has been scheduled for 60 months.

“The overall Sibiu–Pites¸ti motorway project represents an important section of the Pan-European Corridor IV. We are proud to now be taking on another essential part of this transport axis,” says Porr CEO Karl-Heinz Strauss. The company is already responsible for the construction...

Related articles:

Romania

“The overall Sibiu-Pite?ti motorway project represents an important section of the Pan-European Corridor IV. We are proud to now be taking on another essential part of this transport axis,” says...

more
Germany

In the course of the new construction of the 5.2-km-long section of the A44, the two-tube Hirschhagen tunnel will play a leading role in traffic technology. The lot has a length of around 4.2 km...

more
Issue 2019-01 Germany ¤ Deutschland

The Porr bidding consortium won the tender for the construction project “A44, VKE 12, Tunnel Hirschhagen, Technische Ausstattung” at the turn of the year 2018/19. Porr Infra GmbH will be responsible...

more
Issue 2022-02 Poland

Submersible Pumps Keep the South Drive Dry The construction work confirmed the results of the exploratory drillings: The southern section is formed by an ancient river valley with a conglomerate of...

more
Germany

Road Tunnel Replaces 69-Year-Old Bridge The Südschnellweg with its two lanes in each direction was developed as from 1954. It includes the federal roads 3, 6 and 65 and is of great importance for...

more