Search

Your search for "" found 2005 Hits

Issue 03/2012

Lungern Bypass: Sprayed Concrete Application directly onto Polymer Waterproofing Membranes

1 Overview In the tunnel widenings for the Lungern bypass/CH, sprayed concrete was applied directly onto the flexible polymer waterproofing-membrane (PWM) in the arch area instead of inner lining...

more
Issue 03/2012

Observation Method Geotechnics – Interlinking Measurements and Simulation

1 Motivation and Background The recorded geological situation represents the basis for planning geotechnical construction measures alongside the structural-specific demands on utilisation,...

more
Issue 03/2012

Influences on Segment Damage

1 Introduction Segments represent the bearing structure for the finished product in mechanised tunnelling. This fact results in high demands both on manufacturing as well as on transporting and...

more
Issue 03/2012

Water Tunnel in Kuala Lumpur

At 44.6 km long below mountainous hard rock, hot springs, and fault zones, Malaysia’s Pahang Selangor Raw Water Tunnel is no easy excavation. A tireless workforce, hailing from Indonesia, Thailand,...

more
Issue 03/2012

ITA-COSUF: The Operation of Safe and Secure Underground Facilities

1 Introduction During the last decades, operational safety of underground structures has received increased public attention mainly after the disastrous fires in alpine road tunnels, fires in the...

more
Issue 03/2012 United Kingdom

The 2 first Crossrail TBMs in Action

For the Crossrail project a new rail link (approx. 30 km) is to be driven beneath central London involving 2 single-track tunnel bores roughly 7 m in diameter using a total of 8 tunnel boring...

more
Issue 03/2012 Switzerland

Galgenbuck Tunnel: Redevelopment of the Schaffhausen-South A4 Hub

By revamping the Schaffhausen-South hub the A4 motorway is to be linked up with the local highway network. The 1,138 m long Galgenbuck Tunnel between Engi and Bahntal with 2 lanes featuring 2-way...

more
Issue 03/2012 Further Training – Tunnel Redevelopment

Workshop on June 4, 2012 at the RUB

In recent decades the major portion of the investments poured into underground construction has been earmarked for infrastructure. However, what is known as upgrading existing structures is also...

more
Issue 03/2012 Underground Trucks

Higher Payload Ratio, Cleaner Air and Enhanced Productivity

Sandvik Mining has launched 2 new underground trucks in the market. The new TH550 and TH540 are the first in the underground mining world to offer energy-efficient and low-emission EPA Tier 4i/EURO...

more
Issue 03/2012 Safety of Life in Tunnels (SOLIT)

International Conference SOLIT2 in Berlin

The International SOLIT Conference (Safety of Life in Tunnels) is due to be held in Berlin on June 27 + 28, 2012: its topic – “Integration of stationary Fire Suppression Systems in Tunnels”. At...

more

Ihre Suche nach "" :

5580 Treffer in "AT Minerals"

8793 Treffer in "Bundesbaublatt"

8244 Treffer in "Betonwerk + Fertigteil-Technik"

7583 Treffer in "bauhandwerk"

1151 Treffer in "Brandschutz"

1173 Treffer in "Computer Spezial"

5292 Treffer in "dach+holzbau"

14947 Treffer in "Deutsche BauZeitschrift"

5621 Treffer in "FACILITY MANAGEMENT"

10944 Treffer in "Kälte Klima Aktuell"

5791 Treffer in "metallbau"

1466 Treffer in "recovery"

11846 Treffer in "SHK Profi"

13201 Treffer in "tab - Das Fachmedium der TGA-Branche"

12105 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2005 Treffer in "tunnel"

5761 Treffer in "Zement Kalk Gips"

3455 Treffer in "Ziegelindustrie International"