Risk Management in Major Tunnelling Projects – Part 3

Creating Incentive Mechanisms for Integrated Project Delivery

Due to their organisational structure and contracts, conventional project delivery models reach their limits in complex large-scale construction projects. In this context, Integrated Project Delivery (IPD) is an alternative regarding a joint project realisation. A probabilistic determination and integral consideration of cost, schedule and risk is the basis for developing an appropriate incentive mechanism for IPA. These elements are linked, simulated and analysed using a digital project risk twin. The results are transparently available to all project partners. Through the set incentive mechanism, the goals of the participants are harmonised and individual risk potentials and dependencies become visible. Based on this, an incentive mechanism has to be designed that ensures a fair pain/gain distribution between the participants.

1 Project Delivery Models
1.1 Overview

A project delivery model consists of three components: the type of award, the contractor assignment form and the type of contract [1, pp. 64-65]. A distinction can be made between conventional project delivery models, which consist of an award and a contractor assignment form (e.g. sole contractor or general contractor), and a contract, which can be a unit price contract or a lump sum price contract. Integrated Project Delivery has a collaborative project structure, which leads to all participants acting in a “best-for-project” manner [2, p. 84]. This is...

Related articles:

Issue 01/2024

Risk Management and Contract Models in Tunnel Construction – Part 1: Basics of Risk Management

1 Introduction Risk management is a project management task in which the opportunities and risks of a project are identified, analyzed, evaluated and monitored. Project-specific risk management is...

more
Issue 06/2021 Risk Management in Major Tunnelling Projects – Part 2

Digital Project Risk Twin – Application for the Construction of U5 East, Hamburg

1 Introduction In the first part, „Risk Management in Major Tunnelling Projects – Part 1: Fundamentals and Success Factors“, the relevance of transparent cost and risk management for large...

more
Issue 02/2021

Risk Management in Major Tunnelling Projects – Part 1: Basics and Success Factors

1 Introduction In Germany, the Reform Commission on the Construction of Major Projects already presented its final report in 2015 [1]. A central recommendation is the implementation of systematic...

more
Issue 04/2020

4D/5D BIM: Project Controlling for Excavation Support at the Bertoldshofen Tunnel

1 Introduction In conventional tunnelling, the geology essentially determines the excavation method and support measures used as the tunnel advances. Since the exact ground stratification and...

more
Issue 05/2018

BIM Application Cases at the Albvorland Tunnel

1 Introduction No other client in Germany is investing so much in infrastructure projects and operating them like German Railways (DB). They also have a policy of keeping up with internationally...

more