Search

Your search for "" found 2003 Hits

Issue 03/2013 TBM tunnelling

Mechanized Excavation for the Chute de Gavet Hydropower Project in France

In the world-wide production of electricity, hydropower is in third place after coal and oil&gas. Therefore it is the most important renewable energy source and makes a significant contribution to the...

more
Issue 03/2013 Anchoring

„Semmering Base Tunnel New” – Securing the Precut with ­Self‑Drilling Anchors

In April 2012, work started on one of the most ambitious construction projects of Austria’s ÖBB-Infrastruktur AG: the New Semmering Base Tunnel. Scheduled for completion in 2024, the 27.3 km long...

more
Issue 03/2013 Injection

Innovative Injection Hose protects the Nordhavnsvej Tunnel from Baltic Sea Water Pressure

The 4-lane Nordhavnsvej Tunnel is currently one of Copenhagen’s biggest construction projects and belongs to the Nordhavnsvej-Vej-og Tunnelenterprise major scheme. It underpasses the Danish capital...

more
Issue 03/2013 Roadheader Drive

Sonnenburg Tunnel: Roadheader Drive under tricky geological Conditions

Construction was executed accompanied by what must be a unique engineering geology investigation programme – for a project of this magnitude. It comprised rock mechanical lab tests as well as...

more
Issue 03/2013 Pumped Storage Station in Linth-Limmern/CH

Formwork Vibrator Application in the Mountains – Linthal  PS Station

In Switzerland since 2009 the Kraftwerk Limmern JV has been involved in setting up a new pumped storage (PS) power station within the scope of the “Linthal 2015” construction project in the...

more
Issue 03/2013 Germany

Katzenberg Tunnel operational

The 8,385 m long Katzenberg Tunnel was opened after 9 years of construction when the timetable changed on December 9, 2012. A few days previously 2 trains, an ICE and a goods train, passed parallel...

more
Issue 03/2013 Interview

Safety – from Tunnel Mouth to Breakthrough

The data relating to the new stormwater section are impressive. The sewer system is designed as a main collector, which is being produced at depths of some 8 to 40 m under the surface by pipe...

more
Issue 03/2013 Austria

Redeveloping the Pfänder Tunnel

After commissioning the 2nd bore in mid-2012, the original 6,585 m long, twin-track bore of the Pfänder Tunnel was closed to traffic to be redeveloped. In late 2012, most of the construction jobs in...

more
Issue 03/2013 Germany

Bleßberg Tunnel; Shuttering Panels made of solid Plastic secures better Result with lower Costs

Admittedly replacing shuttering panels takes time and money and in tunnelling this procedure is always especially complicated and expensive. Thanks to the robust alkus solid plastic panel, the Huber &...

more
Issue 03/2013 Italy

Mainline Tunnel in Bologna in Operation

The Italian railway operator RFI opened the 2 new high-speed links between Bologna and Florence and Bologna and Milan on June 22, 2012. As a result, regional traffic has been separated from the...

more

Ihre Suche nach "" :

5499 Treffer in "AT Minerals"

8703 Treffer in "Bundesbaublatt"

8150 Treffer in "Betonwerk + Fertigteil-Technik"

7526 Treffer in "bauhandwerk"

1143 Treffer in "Brandschutz"

1149 Treffer in "Computer Spezial"

5190 Treffer in "dach+holzbau"

14779 Treffer in "Deutsche BauZeitschrift"

5557 Treffer in "FACILITY MANAGEMENT"

10811 Treffer in "Kälte Klima Aktuell"

5718 Treffer in "metallbau"

1433 Treffer in "recovery"

11750 Treffer in "SHK Profi"

13062 Treffer in "tab - Das Fachmedium der TGA-Branche"

12040 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5684 Treffer in "Zement Kalk Gips"

3431 Treffer in "Ziegelindustrie International"