Search

Your search for "" found 2090 Hits

Issue 06/2013

Punta Olimpica Tunnel in Peru – the highest Tunnel in the World

Strategic Importance of the Punta Olimpica Tunnel Peru has an imbalance in population distribution in that 54.6 % of the population is concentrated in the areas along the Pacific Ocean, while only...

more
Issue 06/2013

Marmaray Project with Bosporus Tunnel in Istanbul/TR – immersed Tunnel

Whereas other metropolises display concern that their commuter transportation systems might suddenly come to a halt, this situation is a daily one in Istanbul. Even on normal weekdays, it is advisable...

more
Issue 06/2013 Book Review

Austrian Guideline on Tunnel Seals

Austrian Society for Construction Technology (öbv) Guideline, December 2012. 124 pp. DIN A4 with 96 Ill./Tab. and 106 Sources. Bound € 45. www.bautechnik.pro. The requirements on the ground and...

more
Issue 06/2013 Book Review

The Katzenberg Tunnel

Upgraded and new Karlsruhe-Basle Route, Issued by: DB ProjektBau GmbHm 2012, 120 pp. (210x297 mm) with 110 Ill. /Tab. and 20 Sources, ISBN 978-3-7771-0450-8, bound € 38.-, DVV Media Group GmbH,...

more
Issue 06/2013 Austria

Bosruck Tunnel: Redeveloping the existing Bore

A second bore was produced by drill+blast using the New Austrian Tunnelling Method (NATM) for the 5.5 km long, 2-lane Bosruck Tunnel on the A 9 motorway. It possesses 2 lanes. After being broken...

more
Issue 06/2013

Grooved mechanical Piping Systems in Tunnels

Introduction Pipelines for various purposes are needed in tunnels such as: During the construction phase to supply tunnelling machines with compressed air and water and to remove muck. During the...

more
Issue 06/2013 Book Review

Austrian Guideline on Inner-Shell Concrete

Guideline of the Austrian ­Society for Construction Technology (öbv), Vienna/A, December 2012, 99 pp., DIN A4 with 42 Ill. /Tab. and 50 sources, bound € 45. www.bautechnik.pro The “Inner-Shell...

more
Issue 06/2013 Austria

Arlberg Tunnel: 37 new Escapeways

At the end of 2010 the ÖBB recommissioned the 10 km long rail tunnel with 2 tracks after completing 8 evacuation and rescue ways leading to the parallel running Arlberg road tunnel The costs involved...

more
Issue 06/2013 Italy

Handover of world‘s largest EPB shield machine for Italy‘s A1 autostrada

EPB shield S-574 for upgrading of the autostrada (motorway) route between Italy‘s cities of Bologna and Florence successfully passed its acceptance inspection by the Italian client at the Herrenknecht...

more
Issue 05/2013 On the Topic of…

Infrastructures for the Future

Progress requires mobility. And mobility requires infrastructures that function. It is hardly surprising that Europe is participating in the costs for upgrading the infrastructure and creating...

more

Ihre Suche nach "" :

5931 Treffer in "AT Minerals"

9031 Treffer in "Bundesbaublatt"

8625 Treffer in "Betonwerk + Fertigteil-Technik"

7830 Treffer in "bauhandwerk"

1212 Treffer in "Brandschutz"

1314 Treffer in "Computer Spezial"

5545 Treffer in "dach+holzbau"

15526 Treffer in "Deutsche BauZeitschrift"

5870 Treffer in "FACILITY MANAGEMENT"

11462 Treffer in "Kälte Klima Aktuell"

6085 Treffer in "metallbau"

1689 Treffer in "recovery"

12214 Treffer in "SHK Profi"

13634 Treffer in "tab - Das Fachmedium der TGA-Branche"

12330 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2090 Treffer in "tunnel"

5808 Treffer in "Zement Kalk Gips"

3556 Treffer in "Ziegelindustrie International"