Search

Your search for "" found 2090 Hits

Issue 04/2011 Germany – Training Course

German tunnel-Forum in Cologne and Hamburg

In autumn 2011 STUVA and tunnel are jointly embarking on a new series of events captioned the “German tunnel-Forum”. We are pursuing the aim of presenting out-of-the-ordinary special topics on...

more
Issue 04/2011 Austria

Roppen Tunnel fully commissioned

A second tube was produced largely by mining means together with cross-passages to the existing bore for the more than 5 km long, single-tube Roppen Tunnel near Imst for the Inntal motorway (A12)....

more
Issue 04/2011 Austria

The Lower Inn Valley line Tunnel shell completed

The Austrian Federal Railways (ÖBB) project engineers working on the new Lower Inn Valley line awarded themselves an early Christmas present in late 2010, with the application, at Radfeld on December...

more
Issue 04/2011 IUT ´11 – Innovation underground

Worldwide Unique Tunnel Fair

The international fair for underground construction and tunnelling – the IUT ‘11 – from September 14 to 15, 2011 at the Hagerbach Test Gallery (VSH) – is a unique event worldwide: after all...

more
Issue 04/2011 Austria

Arlberg Tunnel again 2-Track

An extensive safety-technical project by the ÖBB Infrastruktur AG has been concluded following 6 years of work for the Arlberg Tunnel has now bee operational again on a 2-track basis since December...

more
Issue 04/2011 Germany

Tunnelling Operations concluded in Mainz

It was realised relatively early on that the Mainz railway hub could not be adequately serviced by means of the 2-track rail tunnel in use since 1887. The Old Mainz Tunnel (AMT) consists of 2...

more
Issue 04/2011 Germany

New Ebensfeld-Erfurt Rail Route: Lohmeberg and Feuerfelsen Tunnels

Work on producing 2 further tunnels on the 107 km long new rail route (NBS) between Ebensfeld and Erfurt with a designated speed of 300 km/h has begun. The route is part of the 500 km long new and...

more
Issue 04/2011

Rail Technology for the Gotthard Base Tunnel

The first Swiss north-south high-speed route between Zurich and Milan including the Gotthard and Monte Ceneri tunnels is some 90 km long. Since 2009 work on installing the rail technology in the...

more
Issue 04/2011

Gotthard 2016: All Signals set at Green?

1 Introduction 2010 represented an outstanding year for the AlpTransit Gotthard AG as the NEAT Gotthard Axis client with the main breakthrough at the Gotthard Base Tunnel. It can also be described as...

more
Issue 04/2011

Ceneri Base Tunnel: Stage reached by Work

1 Introduction The Ceneri Base Tunnel passes through Monte Ceneri over a length of 15.4 km. The overburdens amount up to 800 m. The route alignment takes the geological and topographical conditions...

more

Ihre Suche nach "" :

5927 Treffer in "AT Minerals"

9031 Treffer in "Bundesbaublatt"

8624 Treffer in "Betonwerk + Fertigteil-Technik"

7827 Treffer in "bauhandwerk"

1212 Treffer in "Brandschutz"

1312 Treffer in "Computer Spezial"

5542 Treffer in "dach+holzbau"

15523 Treffer in "Deutsche BauZeitschrift"

5869 Treffer in "FACILITY MANAGEMENT"

11458 Treffer in "Kälte Klima Aktuell"

6083 Treffer in "metallbau"

1662 Treffer in "recovery"

12214 Treffer in "SHK Profi"

13630 Treffer in "tab - Das Fachmedium der TGA-Branche"

12330 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2090 Treffer in "tunnel"

5808 Treffer in "Zement Kalk Gips"

3556 Treffer in "Ziegelindustrie International"