Search

Your search for "" found 2029 Hits

Issue 07/2010 Germany

Special Permit for the Filder Tunnel

The 9,500 m long Filder Tunnel with two single-track bores built as an S-Bahn tunnel to Stuttgart Airport within the scope of the Stuttgart 21 Project can also be used for main line trains. The...

more
Issue 07/2010 Switzerland/Germany

www.iut.ch: The one-click route to the 6th IUT ’11 in Sargans

Readers wishing to get the latest information, any time, any place, on ongoing preparations for the IUT ’11, again to be held at the Hagerbach Test Gallery near Sargans, Switzerland, on September 14...

more
Issue 07/2010 Germany

New Ebensfeld-Erfurt Route: Lichtenholz Tunnel

The two-track Lichtenholz Tunnel with a length of 931 m located in the District of Lichtenfels is part of the 107 km long new railway line between Ebensfeld and Leipzig (with a total of 22 tunnels),...

more
Issue 07/2010 Germany

New Ebensfeld-Leipzig Line: Main Drive for the Silberberg Tunnel

The 107 km long Deutsche Bahn AG new line from Ebensfeld to Leipzig is part of the new and upgraded route from Nuremberg to Berlin, the German Unity Transport Project No. 8, which will become...

more
Issue 07/2010

Obituary: Prof. Dipl.-Ing. Heinz Wind

Prof. Heinz Wind died, after a severe illness, on August 20, 2010, shortly before his 80th birthday. During his thirty-seven years in the construction industry, Heinz Wind played a definitive role as...

more
Issue 07/2010 Switzerland

Silvaplana Tunnel – High Demands on Safety

For generations Silvaplana has represented an important traffic hub between North Bünden and the Engadin. Transit traffic is increasingly being seen as a burden. At the end of 2007 an outline project...

more
Issue 07/2010 Switzerland

Improving national road tunnel safety

The tunnels of the 1,800 km Swiss national road network are among the safest in the world. However, standards and guidelines evolve continuously. The Swiss Road Authority (ASTRA) is addressing this...

more
Issue 07/2010 Bulgaria

Metro Construction in Sofia

Metro construction in Sofia is being expanded by means of the new Line 2; a 17 km long route is planned from the Obelya Terminal for Line 1 via Nadejda, the Central Station and the National Art...

more
Issue 07/2010 Switzerland

New Ventilation for the Belchen Tunnel

After the fires in the Mont Blanc, Tauern and Gotthard, in the interim safety regulations have been introduced to protect motorists and emergency services. For example smoke is to be removed quickly...

more
Issue 07/2010 Austria

Second Bore for the Tauern Tunnel

The second bore for the Tauern Tunnel on the A10 motorway is 6,400 m long and was driven by mining means within 22 months. It was opened on April 30, 2010 following less than 4 years’ construction,...

more

Ihre Suche nach "" :

5653 Treffer in "AT Minerals"

8882 Treffer in "Bundesbaublatt"

8296 Treffer in "Betonwerk + Fertigteil-Technik"

7620 Treffer in "bauhandwerk"

1162 Treffer in "Brandschutz"

1186 Treffer in "Computer Spezial"

5306 Treffer in "dach+holzbau"

15106 Treffer in "Deutsche BauZeitschrift"

5681 Treffer in "FACILITY MANAGEMENT"

11068 Treffer in "Kälte Klima Aktuell"

5848 Treffer in "metallbau"

1526 Treffer in "recovery"

11922 Treffer in "SHK Profi"

13284 Treffer in "tab - Das Fachmedium der TGA-Branche"

12157 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2029 Treffer in "tunnel"

5786 Treffer in "Zement Kalk Gips"

3470 Treffer in "Ziegelindustrie International"