Search

Your search for "" found 2029 Hits

Issue 08/2010

Advances in concrete curing for the Jagdberg Tunnel, Jena

The Jagdberg Tunnel, a new section of the A4 Eisenach to Görlitz Highway located between the Magdala and Jena/Göschwitz junctions, has been under construction since 2008. Completion of the two...

more
Issue 08/2010

Access Adit I for Kraftwerke Linth-Limmern

Lot A1 is a component of the Linthal 2015 project for Kraftwerke Linth-Limmern AG (KLL), which will include comprehensive expansion of KLL‘s facilities. An additional balancing reservoir is to be...

more
Issue 08/2010

Tunnelling in Germany: Statistics 2009/2010, Analysis and Outlook

1 Statistics on Tunnels under Construction 2009/2010 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2009/2010. The outcome...

more
Issue 08/2010 Switzerland/Germany

IUT ’11: The early bird saves!

Those who make a prompt decision will reap worthwhile benefits - whether as exhibitors or visitors - at the IUT '11, to be held in the Hagerbach Test Gallery (VSH), near Sargans, Switzerland, from...

more
Issue 08/2010 Switzerland

Gotthard Base Tunnel: First bore completion breakthrough in world‘s longest rail tunnel

The world‘s longest rail tunnel is coming ever closer to reality: the first bore completion breakthrough in the Gotthard Base Tunnel took place in the eastern bore on October 15, 2010, 30 km from...

more
Issue 08/2010 The Robbins Company

Lok Home: We have regained our position as a leading supplier

In February, 2010, the Robbins Company invited to Corpus Christi, Texas/USA, to join the launch and assembly of three EPBs for the Emisor Oriente Project in Mexico City. During the ceremony we asked...

more
Issue 08/2010 Switzerland

Gotthard Base Tunnel: High-accuracy at final breakthrough

The tunnel-boring machine, affectionately dubbed „Sissi“, in honour of the 19th century Austrian empress, by the international team of tunnellers engaged on the project, completed the final...

more
Issue 08/2010 Austria/Italy

BrennerCongress to be held in Bolzano for the first time in 2011

The fourth “BrennerCon­gress“ is to be held from March 17 to 18, 2011, parallel to the Viatec fair, in Bolzano, Italy. This international symposium will report on the status of work on the...

more
Issue 08/2010 Shotcrete

Shotcrete for Dulles Metrorail Project in Washington D.C.

A mobile Liebherr-mixing plant type Easymix 1.0 produces shotcrete in a tunnelling section of the “Dulles Corridor Metrorail Project” in Washington D.C., Northern Virginia/USA. The Dulles...

more
Issue 08/2010 Formwork Technology

Durable and versatile formwork facing for the Muess Tunnel

All-plastic alkus formwork facing – containing no wood whatsoever – has earned itself a good reputation thanks to its durability and the good concrete surfaces achieved. The engineering benefits...

more

Ihre Suche nach "" :

5653 Treffer in "AT Minerals"

8882 Treffer in "Bundesbaublatt"

8296 Treffer in "Betonwerk + Fertigteil-Technik"

7620 Treffer in "bauhandwerk"

1162 Treffer in "Brandschutz"

1186 Treffer in "Computer Spezial"

5306 Treffer in "dach+holzbau"

15106 Treffer in "Deutsche BauZeitschrift"

5681 Treffer in "FACILITY MANAGEMENT"

11069 Treffer in "Kälte Klima Aktuell"

5848 Treffer in "metallbau"

1526 Treffer in "recovery"

11923 Treffer in "SHK Profi"

13285 Treffer in "tab - Das Fachmedium der TGA-Branche"

12157 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2029 Treffer in "tunnel"

5786 Treffer in "Zement Kalk Gips"

3470 Treffer in "Ziegelindustrie International"